As a professional manufacturer of school furniture,Winner Furniture Group (Foshan, China)—a manufacturer of campus and public seating—has completed the delivery of 1,362 seats for lecture halls and an auditorium at Al-Nibras Private University in Salah al-Din Governorate, Iraq. The order consists of 1,041 lecture hall seats and 321 auditorium seats. As a newly established private institution, Al-Nibras Private University collaborated closely with Winner Furniture to outfit its academic buildings with durable, comfortable, and modern seating for its large lecture halls and main auditorium. The project encompassed the entire scope of work, including product selection, factory inspection, contract signing, mass production, comprehensive quality control, and ocean freight logistics.
Client | Al-Nibras Private University (جامعة النبراس الأهلية), Salahuddin, Iraq |
Order | 1,362 seats total — 1,041 stepped lecture hall chairs + 321 auditorium chairs |
Product lines | Tiered lecture hall seating and auditorium chair |
Project phase | New university campus, teaching buildings under fit-out |
Project Timeline
Date | Milestone | Detail |
August.13.2025 | Initial contact | Al-Nibras procurement team inquires about stepped lecture hall and auditorium seating |
August.21.2025 | Evaluation & factory visit | The client placed an order for samples to evaluate product quality and production capabilities; the team also conducted an on-site visit to our showroom in Foshan. |
September.9.2025 | Contract signed | Pricing, terms, quality standards and delivery plan agreed; 1,362-seat order confirmed |
September to October 2025 | Batch production & QC | Full-process quality control; products produced, inspected and packed in batches |
October.9. 2025 | All goods shipped | Containers loaded and handed over to the logistics chain on schedule |
Al-Nibras Private University was formally licensed in late 2024 and is now rapidly fitting out its campus in the Al-Alam district, Salahuddin. The client needed two distinct seating systems: a large stepped lecture hall (rakisa) to seat 1,041 students, and a main auditorium to seat 321. Both had to meet strict quality and durability standards, support heavy daily teaching use, and arrive on schedule to keep the university's opening and academic calendar on track.
![]()
After initial contact in August 2025, the client ran several rounds of evaluation on our stepped lecture hall and auditorium product lines, production capacity and service capability. During the site visit, our team accompanied the client to the product showroom, where we presented samples of lecture hall and auditorium seating. We engaged in a detailed discussion regarding project specifics, including lead times, product materials, and various design details.
We provided a detailed explanation regarding material specifications, load-bearing steel structures, manufacturing processes, dimensions for seating and tabletops, and suitability for a campus environment. Furthermore, we held in-depth discussions concerning row spacing, the inclusion of logos on auditorium chairs, customization details, quality standards, and order quantities, leading to a preliminary agreement to collaborate.

For lecture halls and auditoriums, we provide custom solutions tailored precisely to the styles requested by the client, with careful attention to the details of the products:
We replicated the client's intended style 1:1 into physical custom samples — covering both the stepped lecture hall chair and the auditorium chair — so the client could verify the look, feel and dimensions before production · Powder-coated cold-rolled steel frames for rust resistance and long structural life
l Thickened, anti-scratch seat and back shells with writing tablets for note-taking
l Reinforced welding on load-bearing structures to withstand high-frequency public use
l Easy-to-clean upholstery rated for high-traffic teaching environments
l Anti-slip, anti-scratch bases for stable and safe stepped-row installation
As a specialized primary manufacturer and producer of school furniture, we created custom samples based precisely on the reference designs provided by the client. Following the client’s approval of these samples, both parties reached an agreement regarding pricing, terms, quality standards, and delivery schedules, and subsequently signed a formal procurement contract for 1,362 units.
Once the contract is signed, the order immediately enters a controlled production phase. As each chair is a bespoke item manufactured to custom specifications—based on samples approved by the client—we coordinate production capacity for the total quantity of 1,362 units, secure raw material supplies in advance, and synchronize manufacturing and inspection processes in batches. This ensures both strict adherence to specifications and timely delivery.
A standardized full-process quality-control system covered:
l Inspect incoming steel, panels and upholstery against the approved sample
l Precision cutting, CNC bending and certified welds, checked seam by seam
l Surface treatment with a uniform powder-coat, verified for finish and color
l Full assembly, functional test and dimensional check before sign-off
Each batch must pass inspection before it can proceed to the packaging stage; ultimately, the university receives seating that is structurally sound, expertly crafted, and precisely dimensioned to fit perfectly within its lecture halls and auditoriums.
The chairs are destined for a sea voyage spanning tens of thousands of kilometers. To withstand the challenges of long-distance ocean transport—such as high humidity, stacking, and rough handling—each chair is protected by multi-layered packaging, ensuring they remain free from scratches, deformation, or paint damage.
By late September 2025, the full order had completed production, inspection and packing as planned, with goods neatly stored in the warehouse, ready for container loading.
In October 2025, the loading process began. Before sealing the container, we carefully verified the number of items and ensured the cargo was loaded properly. The container was then dispatched to the port and handed over to the final leg of the logistics chain, destined for the Nabras campus in Salah al-Din Governorate.

From the initial communication in August 2025 to the successful dispatch of the containers in October 2025—with delivery completed well within the project timeline—this achievement is a testament to a mature, professional team. Ultimately, the project was delivered on schedule, featuring a large tiered lecture hall with 1,041 seats and an auditorium with 321 seats, both ready for immediate use.Two factors drove successful closure:
l With our precise customization and delivery capabilities, combined with rigorous oversight of production capacity at the source, we are committed to delivering the perfect product to our clients.
l End-to-end client support — responsive communication and priority production scheduling. We always put our clients first, working closely with them to discuss every detail of their projects.
“Choose WINNER ,Choose Quality life” — WINNER Furniture Group
For a brand-new campus counting the days to opening, that speed and reliability matter more than any promise. Going forward, we keep showing up as the fast, reliable partner overseas campuses can count on and keep raising the bar for what a Chinese manufacturer can deliver.
How many seats did Winner Furniture supply to Al-Nibras Private University?
Winner Furniture Group supplied 1,362 seats in total: 1,041 seats of stepped lecture hall chairs for the tiered rakisa hall and 321 seats of auditorium chairs for the main auditorium.
What is a stepped lecture hall chair (rakisa seating)?
It is tiered seating installed on stepped risers, usually with an integrated writing tablet, used in large university lecture halls so that every student has a clear line of sight to the front and can take notes.
How long did the project take from first contact to delivery?
The process spanned about two months: initial contact was made in August 2025; factory visits and contract signing took place between August and September 2025; this was followed by mass production and quality control (continuing through October); and all containers were shipped by October 2025.
How should customers install the products upon receipt?
Winner Furniture provides professional installation guidance in the form of videos or images, and we work closely with customers to address their specific needs once they have received their items.
Copyright © Foshan Winner Furniture Co., Ltd. All Rights Reserved |
Sitemap
| Technical Support: